Transparent Pricing, Clear Savings!
Our Pricing Model is Simple & Flexible
Start with base, then increase your savings & value with add-ons like pre-installed exterior wall sheathing, Rough Electrical & Plumbing systems, and windows. Save up to 20% direct cost & 40% time with LIVIO.
Pay only for what you need, based on your project’s size! All prices are based on Floor area of the structure (Floor area = Buildable Area+ Balconies+ Covered Porches, Patios)
PACKAGES | PRODUCT | < 2,500 SQ.FT. | < 10,000 SQ.FT. | < 50,000 SQ.FT. | < 100,000 SQ.FT. | > 100,000 SQ.FT. |
---|---|---|---|---|---|---|
BASE | Full Framing + (Floor & Roof) Sheathing + Staircase | $10.52 | $10.50 | $10.00 | $9.50 | Contact Us |
EXTERIOR OPTIONS (Choose One) | ||||||
A | Add Exterior Sheathing | $1.99 | $1.69 | $1.49 | $1.00 | Custom Price |
B | Add Exterior Sheathing + Rigid Insulation + Drain Wrap | $3.99 | $3.49 | $3.29 | $3.00 | β |
MEP OPTIONS (Choose One) | ||||||
C | Add Rough Plumbing | $4.99 | $4.49 | $4.00 | $3.49 | β |
D | Add Rough Plumbing + Rough Electrical | $10.99 | $10.49 | $10.29 | $9.99 | β |
FULL PACKAGE (Base + B + D) | $24.48 | $23.58 | $22.49 | β | ||
π FULL PACKAGE (All Included & Discounted) | $23.99 | $23.49 | $21.99 | $20.49 | Schedule a Call | |
ADD SHIPPING (ANYWHERE IN U.S.) | $6.00 | $5.49 | $4.99 | $4.49 | Know More | |
ADDITIONAL UPGRADES | ||||||
E | Add Acoustical Layer to Subfloors | $1.20 | $1.10 | $1.00 | $0.99 | β |
F | Add Pre-installed Windows | $9.73 | $9.49 | $9.00 | $8.49 | β |
Whatβs Included
- Shipping to Job site, Delivery within 50 miles of a major port
- All tariffs & Custom duties
- All load-bearing & non-load-bearing walls
- Factory-made connectors
- Mobile app with erection sequence guidance
- LIVCube packaging for safe delivery
Whatβs Not Included
- Sales tax
- Seismic/ Hurricane/ Snow loads on structures
- Structural / Red Iron Steel / HRS (if required)
- Simpson connectors, screws & bolts
- IBT (Inverted Bottom Tracks) , trusses
- Engineering or design services
- On-site installation
- Warehousing / storage
- Special connectors (if required)
PRICING VARIATION:
Prices are indicative only and may vary based on following factors:
- Distance of job site from port
- Complexity of Roofs & Trusses
- Active / inactive loads on structures
- Non-stacked vertical loads


CASE STUDY-1
LIVIO DELIVERS $1.77+ M cost saving in 150 cottages project in texas
Project Overview
Location: Springtown, Texas 76082
A client approached us to explore cost-effective yet high-quality construction options for their 150 Cottages Project (Each approx. 1-story, 1200 sq. ft. home). The developers’ bid using Traditional lumber was 10% higher than what he could achieve using LIVIO’s Multi-trade pre-assembled building system for rapid construction.Β

Key Efficiency Drivers with Livio
Framing Labor Reduced by 75%
Use of Livio's pre-assembled, high-strength building system streamlined the erection process.
Foundation Savings of 20%
Livioβs lightweight structural load reduced foundation requirements, translating into significant material and labor savings.
Electrical & Plumbing (MEP) Efficiencies
Rough-in costs for electrical and plumbing saw savings of over 33-35%
Cut at least 50% Overall Construction timelines
Better schedule reliability and coordination due to offsite precision
Up to 23% Savings on Windows
Standardized pre-installed window shipped with panels saves both material & labor cost!
GC's CONSTRUCTION HARD-COST COMPARISON
Description | GC's Quote (Traditional Lumber) | LIVIOβs Quote (Panelized System) | Type | Time Savings | Cost Savings |
---|---|---|---|---|---|
City Permits | $5,550.00 | $5,550.00 | 0% | 0% | |
Sewer Tap Fee | $4,000.00 | $4,000.00 | 0% | 0% | |
Warranty Fees | $500.00 | $500.00 | 0% | 0% | |
3rd Party Inspections - Energy | $350.00 | $350.00 | 0% | 0% | |
Architecture | $2,900.00 | $2,900.00 | 0% | 0% | |
Architect Plan Design | $300.00 | $300.00 | 0% | 0% | |
Blueprints | $25.00 | $25.00 | 0% | 0% | |
Lot Stake with House Envelope Survey | $130.00 | $130.00 | 0% | 0% | |
Form Board Survey | $250.00 | $250.00 | 0% | 0% | |
Plot Plan | $85.00 | $85.00 | 0% | 0% | |
Site Work/Rough Grading | $485.00 | $485.00 | 0% | 0% | |
Dumpster & Ext Clean | $1,350.00 | $750.00 | Indirect | 50% | 44% |
Erosion/Temp Fencing | $75.00 | $50.00 | Indirect | 50% | 33% |
Temporary Electric | $390.00 | $250.00 | Indirect | 50% | 36% |
Temporary Water | $280.00 | $200.00 | Indirect | 50% | 29% |
Portable Toilet | $70.83 | $50.00 | Indirect | 50% | 29% |
Termite Protection | $187.33 | $0.00 | Indirect | 100% | 100% |
Concrete Turnkey | $10,341.50 | $8,841.50 | Indirect | 10% | 15% |
Frame - Material | $15,993.75 | $16,000.00 | Direct | 0% | 0% |
Framing Labor | $9,006.25 | $2,251.00 | Direct | 75% | 75% |
HVAC Rough In | $4,500.00 | $3,000.00 | Direct | 50% | 33% |
HVAC Final | $4,000.00 | $3,000.00 | Direct | 50% | 25% |
Plumbing Rough In | $3,000.00 | $3,500.00 | Direct | 50% | -17% |
Plumbing Final | $3,100.00 | $2,000.00 | Direct | 50% | 35% |
Plumbing Fixtures | $2,019.82 | $2,019.82 | 0% | 0% | |
Electrical Rough In | $4,500.00 | $3,500.00 | Direct | 75% | 22% |
Audio/Video/Security | $500.00 | $500.00 | 0% | 0% | |
Electrical Final | $3,000.00 | $2,000.00 | Direct | 75% | 33% |
Light Fixtures | $1,200.00 | $1,200.00 | 0% | 0% | |
Roof Turnkey | $3,900.00 | $3,900.00 | 0% | 0% | |
Gutters and Downspouts | $300.00 | $300.00 | 0% | 0% | |
Specialty Elevation Windows | $275.00 | $275.00 | 0% | 0% | |
Windows | $2,350.00 | $1,800.00 | Direct | 90% | 23% |
Exterior Doors | $900.00 | $500.00 | β | 44% | |
Interior Doors | $1,460.00 | $1,460.00 | 0% | 0% | |
Garage Doors | $600.00 | $600.00 | 0% | 0% | |
Insulation | $1,818.00 | $1,818.00 | 0% | 0% | |
Drywall | $5,454.00 | $5,454.00 | 0% | 0% | |
Drywall Patches | $490.86 | $490.86 | 0% | 0% | |
Vinyl/Laminate Installed | $7,500.00 | $7,500.00 | 0% | 0% | |
Granite Counter Tops | $2,500.00 | $2,500.00 | 0% | 0% | |
Cabinets | $3,800.00 | $3,800.00 | 0% | 0% | |
Stair Parts | $150.00 | $150.00 | 0% | 0% | |
Hardware | $387.98 | $387.98 | 0% | 0% | |
Trim Labor | $2,600.00 | $2,600.00 | 0% | 0% | |
Trim Materials | $2,200.00 | $2,200.00 | 0% | 0% | |
Appliances | $1,541.51 | $1,541.51 | 0% | 0% | |
Interior/Exterior Paint | $5,403.75 | $5,403.75 | 0% | 0% | |
Mirrors | $150.00 | $150.00 | 0% | 0% | |
Interior & Window Clean | $300.00 | $300.00 | 0% | 0% | |
Power Wash Exterior | $50.00 | $50.00 | 0% | 0% | |
Rental Equipment | $500.00 | $750.00 | β | -50% | |
Unexpected Costs | $500.00 | $500.00 | 0% | 0% | |
Project Management | $3,902.00 | $1,951.00 | Indirect | 50% | 50% |
Shipping (LIVIO Only) | β | $9,647.00 | Direct | β | β |
Total | $118,013.27 | $106,167.67 | 50% Faster | ~10% Savings |
Conclusion
LIVIOβs proposal demonstrates how offsite construction can bring measurable savings, not just in labor, but in overall project cost and predictability. With a 10% reduction in hard costs across a 150-cottage development, the developer could save approximately $1.77 million, all while:
- Reducing project risk
- Streamlining scheduling
- Minimizing labor dependency
- Improving build quality
This case study sets a strong precedent for LIVIOβs role as a perfect solution for developers doingΒ high-volume residential construction.
CASE STUDY-2
$10.7M COST SAVINGS & 40% FASTER DELIVERY ON 120-UNIT CONDO DEVELOPMENT IN FREMONT, CA
Project Summary
Address: Prune Avenue, Fremont, CA 94539
Scope: 120 Condominiums | 5-Story Residential
Development Objective: To evaluate cost and time
efficiencies by switching from a traditional lumber framing based approach to Livioβs Multi-trade pre-assembled building system.
Livio partnered with the client to run a comprehensive cost and schedule analysis. The result? A projected cost
savings of $10.78 million and an estimated 40% reduction
in construction time, while maintaining all performance
and design expectations.

The Challenge
The client was working with an existing general contractor using traditional lumber framing, facing rising construction costs, extended project timelines, and labor shortages typical of the California market. The client sought a strategic building system shift to improve their ROI.
GC's Construction Hard-Cost Comparison
TRADES | GC'S QUOTE WITH TRADITIONAL LUMBER | GC'S QUOTE WITH LIVIO'S SYSTEM | DIRECT COST SAVINGS % |
---|---|---|---|
1010.000 Surveying & Staking | $64,900.00 | $64,900.00 | 0% |
1013.000 Testing & Inspections | $75,466.00 | $75,466.00 | 0% |
1032.000 Project Manager | $558,000.00 | $390,600.00 | 30% |
1430.000 Rental Equipment | $295,895.00 | $295,895.00 | 0% |
1510.000 Temporary Facilities | $248,980.00 | $248,980.00 | 0% |
1530.000 Final Clean up | $97,300.00 | $97,300.00 | 0% |
1560.000 Supervision | $666,360.00 | $466,452.00 | 30% |
1565.000 Liability | $387,559.00 | $348,803.10 | 10% |
1571.000 Profit | $2,183,432.00 | $2,183,432.00 | 0% |
1572.000 Overhead | $936,000.00 | $655,200.00 | 30% |
1590.000 Temporary Labor | $182,153.00 | $182,153.00 | 0% |
2196.000 Onsite & Offsite Concrete | $999,290.00 | $999,290.00 | 0% |
2315.000 Traffic Control | $157,895.00 | $157,895.00 | 0% |
2320.000 Grading | $670,090.00 | $670,090.00 | 0% |
2330.000 Paving | $1,005,000.00 | $1,005,000.00 | 0% |
2351.000 Erosion Control | $68,950.00 | $68,950.00 | 0% |
2354.000 Underground Utilities | $1,148,952.00 | $1,148,952.00 | 0% |
2454.000 Sealing & Striping | $69,236.00 | $69,236.00 | 0% |
2457.000 Wrought Iron Fence | $340,560.00 | $340,560.00 | 0% |
2900.000 Landscaping & Irrigation | $580,995.00 | $580,995.00 | 0% |
3100.000 Foundation Concrete | $1,016,900.00 | $813,520.00 | 20% |
3360.000 Gyp-Concrete | $330,905.00 | $165,452.50 | 50% |
4010.000 Trash Enclosure | $60,560.00 | $30,280.00 | 50% |
4042.000 Brick Veneer | $504,890.00 | $504,890.00 | 0% |
5100.000 Structural Steel | $1,055,960.00 | $211,192.00 | 80% |
5103.000 Balcony Metal Railing | $377,730.00 | $377,730.00 | 0% |
5117.000 Bicycle Rack w/ Shelter Structure | $79,825.00 | $79,825.00 | 0% |
5119.000 Trellis/ Awning | $289,000.00 | $289,000.00 | 0% |
6105.000 Lumber Material | $3,125,000.00 | $2,160,000.00 | 31% |
6110.000 Framing Labor | $2,075,000.00 | $1,037,500.00 | 50% |
6116.000 Trusses | $245,000.00 | $122,500.00 | 50% |
7200.000 Insulation | $525,000.00 | $525,000.00 | 0% |
7300.000 Roofing | $496,000.00 | $496,000.00 | 0% |
7301.000 Roof Hatch And ladder | $19,550.00 | $19,550.00 | 0% |
7303.000 Metal Coping | $44,000.00 | $44,000.00 | 0% |
7305.000 Metal Roof at Trash Enclosure | $25,580.00 | $25,580.00 | 0% |
7620.000 Gutters Downspouts & Scupper | $67,850.00 | $67,850.00 | 0% |
8210.000 Door Material | $947,725.00 | $947,725.00 | 0% |
8220.000 Door Installation | $318,000.00 | $318,000.00 | 0% |
8405.000 Storefront | $250,031.00 | $250,031.00 | 0% |
8505.000 Windows Material | $501,200.00 | $400,960.00 | 20% |
8510.000 Windows Installation | $144,000.00 | $72,000.00 | 50% |
9100.000 Stucco | $800,250.00 | $560,175.00 | 30% |
9101.000 Fibre Cement Siding | $1,101,840.00 | $771,288.00 | 30% |
9106.000 Scaffolding | $190,000.00 | $190,000.00 | 0% |
9122.000 Wood/Metal Furring | $99,890.00 | $0.00 | 100% |
9250.000 Drywall | $2,225,000.00 | $1,557,500.00 | 30% |
9260.000 Acoustic Ceiling | $255,650.00 | $204,520.00 | 20% |
9264.000 Soffit & Fascia | $198,900.00 | $198,900.00 | 0% |
9265.000 Metal Stud Ceiling | $466,900.00 | $0.00 | 100% |
9276.000 West Coast at balcony | $189,520.00 | $189,520.00 | 0% |
9406.000 Carpet & LVT Tile Material | $499,520.00 | $499,520.00 | 0% |
9600.000 Carpet & LVT Tile Installation | $385,695.00 | $385,695.00 | 0% |
9900.000 Painting | $361,580.00 | $361,580.00 | 0% |
9901.000 Fire Paint | $99,560.00 | $99,560.00 | 0% |
9955.000 Wallpaper | $360,560.00 | $360,560.00 | 0% |
10520.000 Fire Extinguisher & Cabinets | $31,998.00 | $31,998.00 | 0% |
10805.000 Bathroom Accessories | $96,570.00 | $96,570.00 | 0% |
10851.000 Tub & Shower Surround Panel & Pan Material | $348,000.00 | $348,000.00 | 0% |
10852.000 Tub & Shower Surround Panel & Pan Installation | $180,000.00 | $180,000.00 | 0% |
10861.000 Countertop Material | $309,600.00 | $309,600.00 | 0% |
10862.000 Countertop Installation | $72,000.00 | $72,000.00 | 0% |
12300.000 Cabinets, Finish Cabinetry Material | $516,000.00 | $516,000.00 | 0% |
12310.000 Cabinets, Finish Cabinetry Installation | $132,000.00 | $132,000.00 | 0% |
13202.000 Pool | $400,000.00 | $400,000.00 | 0% |
14200.000 Elevator | $780,000.00 | $780,000.00 | 0% |
15100.000 Plumbing | $3,096,000.00 | $2,012,400.00 | 35% |
15300.000 Fire Protection: Sprinkler Excluding Fire Pump | $765,000.00 | $765,000.00 | 0% |
15700.000 HVAC | $2,321,848.00 | $1,509,201.20 | 35% |
16050.000 Fire Alarm | $540,000.00 | $540,000.00 | 0% |
16200.000 Electrical | $3,100,000.00 | $1,550,000.00 | 50% |
16305.000 PGE, Electric, Telephone and Gas | $450,000.00 | $450,000.00 | 0% |
16306.000 Carport | $500,400.00 | $250,200.00 | 50% |
16307.000 Low Voltage | $350,000.00 | $350,000.00 | 0% |
16308.000 Club House | $2,000,000.00 | $1,000,000.00 | 50% |
16309.000 Appliances (Allowance) | $1,939,000.00 | $1,939,000.00 | 0% |
TOTAL | $48,400,000.00 | $37,619,521.80 | $10,780,478.20 |
Conclusion
By partnering with Livio, the client unlocked a new level of efficiency on a complex multifamily project:
- $10.78 million saved
- 22% cost reduction
- 40% faster construction timeline
This case showcases Livioβs ability to provide a smarter way to build, bringing both financial and operational advantage to developers tackling large-scale residential projects.
Interested in replicating these results for your next development?
CASE STUDY-3
How Livio Helped Save 18% on a 4-Home project ( Each 2-Story, 3000 sq.ft.) in CA.
Project Overview
A client approached us to explore cost-effective yet high-quality construction options for their 4 SFR Project (Each approx. 2-story, 2998 sq. ft. custom home). Traditional building methods quoted a total project cost of $814,425 per SFR, which translated to approximately $272 per sq. ft.
By switching to the Livio’s building system, we were able to optimize the project -bringing the total cost down to $669,222, or $223 per sq. ft!

Key Efficiency Drivers with Livio
Framing Labor Reduced by 75%
Use of Livio's pre-assembled, high-strength building system streamlined the shell erection process.
Foundation Savings of 20%
Livioβs lightweight structural load reduced foundation requirements, translating into significant material and labor savings.
Electrical & Plumbing (MEP) Efficiencies
Rough-in costs for electrical and plumbing saw savings of over 30%, enabled by Livioβs precision routing and systemized design.
Insulation Costs Cut by 30%
High-performance insulation panels reduced both installation time and cost.
Up to 65% Savings on Windows
Standardized window modules and partnerships with smart suppliers led to deep material cost reductions.
GC's CONSTRUCTION HARD-COST COMPARISON
TRADES | GC'S QUOTE WITH TRADITIONAL LUMBER | GC'S QUOTE WITH LIVIO'S SYSTEM | DIRECT COST SAVINGS % |
---|---|---|---|
FOUNDATION | |||
Foundation | β | β | 20% savings (lighter foundation with Livio system) |
SUPER STRUCTURE | |||
Framing | $207,000 | $131,912 | 36.27% |
Roofing | $38,500 | $38,500 | β |
Mechanical - Rough | $30,000 | $30,000 | β |
Electrical - Rough | $28,800 | $19,990 | 30.59% |
Plumbing - Rough | $31,200 | $19,990 | 35.93% |
SUPER STRUCTURE - FINISHES | |||
Siding | $55,000 | $55,000 | β |
Insulation | $25,800 | $18,000 | 30.23% |
Drywall | $50,700 | $50,700 | β |
Windows | $35,100 | $12,285 | 65.00% |
Exterior Door | $13,800 | $13,800 | β |
Interior Door | $18,800 | $18,800 | β |
Finish Carpentry | $11,500 | $11,500 | β |
Cabinetry/Millwork/Countertops | $22,400 | $22,400 | β |
Plumbing Accessories | $29,600 | $29,600 | β |
Flooring | $26,800 | $26,800 | β |
Painting | $23,000 | $23,000 | β |
Appliances | $15,000 | $15,000 | β |
Signage | $1,000 | $1,000 | β |
Stairs & Railings | $12,000 | $12,000 | β |
Fireplace | $3,000 | $3,000 | β |
Mechanical - Finish | $8,400 | $8,400 | β |
Electrical - Finish | $12,000 | $12,000 | β |
Plumbing - Finish | $9,600 | $9,600 | β |
TOTAL COST PER UNIT | $814,425 | $669,222 | 17.83% |
TOTAL COST PER SQ FT | $272 | $223 | 18% |
Conclusion
This case study exemplifies how Livio’s Multi-trade pre-assembled building system for rapid construction is smarter, more efficient way to build. The Client reduced direct construction cost per sq. ft. by 18% and total duration by 45%, which further leads to indirect cost savings of over 20%.

Feature | Traditional Lumber Stick-Built | LIVIO Pre-Assembled System |
---|---|---|
Build Time | Long timelines, delays | 40β50% faster overall construction |
Cost Predictability | Frequent cost overruns due to delays and site issues | Fixed costs with factory-set pricing and timelines |
Labor Dependency | Highly labor-intensive; requires skilled trades on-site | Minimal on-site labor; multi-trade Panels arrive with pre-installed rough trades & framing |
Precision | Manual; prone to errors and delays | Factory-controlled precision manufacturing |
Material | Wood (prone to rot, pests, and fire) | High-grade galvanized steel (corrosion-resistant, fire-resistant, pest-proof, weather-durable) |
Sustainability | High waste, deforestation, inefficient supply chain | Low waste, recyclable materials, reduced carbon footprint |
Durability | Susceptible to climate and aging, structural maintenance required | 50+ years of structural life; low maintenance |
Fire Rating | It is combustible, classified as VB | It is classified non-combustible, type IIB |
Choose LIVIO β Build Smarter, Faster, Stronger. |
Feature | LIVIO Pre-Assembled System | Traditional Lumber Construction |
---|---|---|
Construction Type | Type II-B (Non-combustible) | Type V-B (Combustible) |
Primary Material | Galvanized Steel | Wood |
Insurance Impact | Potentially lower premiums due to reduced fire risk | Higher premiums due to increased fire risk |
Building Life Safety | Enhanced safety and containment in fire events | Increased spread risk in fire events |