Skip to content
LIVIO
LIVIO AI FACTORY · LAIF

Modular
by the
megawatt.

Select capacity

Footprint

27 × 10 × 5 m

GPU platform

NVIDIA GB300

Power / rack

150 kW

Resilience

Tier 4

01/Standardized sizes

Four sizes. Identical specs. Only the length changes.

2.5 MWMicro
16 × 10 × 5 m · NVIDIA GB300 · 150 kW/rack · Tier 2/3 Hybrid
5 MWMini
27 × 10 × 5 m · NVIDIA GB300 · 150 kW/rack · Tier 4
10 MWMax
50 × 10 × 5 m · NVIDIA B300 · 250 kW/rack · Tier 2/3 Hybrid
20 MWMega
96 × 10 × 5 m · NVIDIA B300 · 250 kW/rack · Tier 4
02/One integrated delivery

Eight trades, one integrated module. One partner, one number.

Plans & PermitsEarthworkBuilding ShellCoolingElectrical & PowerFire SuppressionControlsSecurity

Engineering, procurement, building, and construction, delivered as one accountable system. Not stitched together across a dozen vendors.

03/How LAIF compares

Faster, accountable, built to outlast the alternatives.

Delivery
75% faster than traditional construction
Weeks to months
12–18 months
Accountability
Single partner, end-to-end
Vendor + local integrators
Multiple contractors
Pricing
Performance fee
Fixed-price with markup
Cost-plus with overruns
Real estate
Permanent, institutional
Relocatable equipment
Permanent, slow permit
Scalability
2.5 / 5 / 10 / 20 MW modules
Container-limited
Custom each time
Service life
50+ years
10–15 years
30–40 years
04/The real model

Not a render. The engineering.

Explore the actual coordinated BIM model of a 7.5 MW AI data center. Orbit, section, and measure the real design. Not a marketing mockup.

Speckle · View-001 · 7.5 MW AI data center

Configure your
AI factory.